Zhejiang Dongming Stainless Steel Energy Storage Project

Location  /  Time

Jiaxing City , China  /  2025.05

Installed Capacity of the Project

eBlock-261 2.5 MW5 MWh

Project Type

C&l Energy Storage

Introduction

This project adopts JDEnergy’s modular intelligent energy storage solution, deploying 19 eBlock-261 in total. It operates under a “two-charge, two-discharge” strategy, with an estimated first-year discharge energy of 2.6759 million kWh and charge energy of 3.0399 million kWh. Based on a 15-year lifecycle evaluation, the project is expected to generate approximately RMB 36.31 million in peak-shaving and valley-filling revenue. The IRR is expected to reach 30%, with a static payback period of around 2.7 years. Beyond exceptional economic benefits, the project marks a critical step in the green transformation of the stainless steel industry and provides a new benchmark for traditional manufacturing exploring the “Storage-Plus” development model.