Ricoh Manufacturing User-Side Energy Storage Project

Location  /  Time

Dongguan City , China  /  2023.01

Installed Capacity of the Project

eBlock-200 3.8 MW7.6 MWh

Project Type

C&l Energy Storage

Introduction

The Ricoh manufacturing project adopts eBlock-200 products, with a total capacity of 3.8MW/7.6MWh, and was successfully connected to the grid in January 2023. Operating under a peak-valley arbitrage model, the system significantly reduces electricity costs, improves power quality, and accelerates Ricoh’s low-carbon transformation—turning energy consumption from a cost center into a source of economic benefit.