Ningxia Tongxin Quanyanbian Energy Storage Project
Location / Time
Wuzhong City , China / 2025.01
Installed Capacity of the Project
eBlock-372
100 MW200 MWh
Project Type
Utility-Scale Power
Introduction
The project includes a total of 540 eBlock-372 and 20 transformer stations. After grid connection, it will not only provide peak shaving, frequency regulation and shared services for multiple regional renewable power stations, but also effectively smooth power generation fluctuations, significantly reduce curtailment, ensures the safe, efficient and stable grid operation. This project plays an important role in advancing the integration of power sources, grids, loads and storage, while fostering multi-energy complementarity in the Ningxia province.