Huizhou “Three Trees” Energy Storage Station
Location / Time
Huizhou City , China / 2020.07
Installed Capacity of the Project
eBlock-172
1 MW2 MWh
Project Type
C&l Energy Storage
Introduction
The owner chose JDEnergy’s modular energy storage solution to leverage peak-valley electricity price differentials and reduce operational costs. The project is named “Three Trees” because three trees on-site had to be preserved and the compact cabinet design of JDEnergy’s solution perfectly accommodated this requirement. Operating on a two-charge, two-discharge daily cycle, this project achieves annual electricity cost savings of approximately RMB 700,000.